- The power produced from the Cedar Creek wind farm is sold to the Public Service Company of Colorado.
- The Cedar Creek Wind Farm was built in 2007 and has 300 MW of generation capacity from 274 wind turbines.
- The Cedar Creek Wind Farm II is owned by BP Wind Energy ( 50 % ) and Sempra Generation ( 50 % ).
- These wind farms include the Cedar Creek Wind Farm, Titan Wind Project, Sherbino Wind Farm, Golden Hills Wind Project, and Fowler Ridge Wind Farm.
- The Cedar Creek Wind Farm I is owned by Cedar Creek Wind Energy LLC which is a conglomerate group with Infigen Energy owning 67 % and BP Wind Energy the other 33 %.
- It's difficult to find cedar creek wind farm in a sentence. 用cedar creek wind farm造句挺難的
- The "'Cedar Creek Wind Farm "'is a 551.3MW, 397 wind turbine facility, consists of 2 phases, Cedar Creek I and Cedar Creek II, located 13 km ( 8 miles ) east of Grover in north-central Weld County, Colorado, which became fully operational with the completion of Cedar Creek II in 2010.